Code Test




 
Top 5 Posters

Code Test :: General :: General Talk :: EFB Biomass Engineering - View Topic
Topic Rating: *****
Printable View
youxu815
New Member
*

Posts: 10
Status: Offline
Joined:  
pm

Reputation: 0%

EFB Biomass Engineering (15th Aug 23 at 6:10am UTC)
EFB Biomass Engineering
EFB Biomass Engineering Palm Empty Fruit Bunch Biomass Power Generation Project
Raw material: Palm Empty Fruit Bunch
Capacity: 1MVA-15MVA
Production index: boiler thermal efficiency 鈮?85%
Main equipment: empty fruit bunch conveyor, shredder, EFB press, dryer, fuel storage bin, steam boiler, condensing steam turbine, transmission system.
The by-product Empty Fruit Bunch (EFB) and palm kernel shell produced at the palm oil mill press factory are not being used effectively. If the palm fruit bunch is not effectively treated, it will pollute the environment. The palm fruit bunch and palm shell are directly burned will result to waste resources.
In order to deal with a large number of empty fruit bunches (EFB), you can choose to build a biomass power project near the dense palm oil crushing plant, which will solve the problem of palm fruit bunches and concentrate on using biomass power generation technology to generate electricity.
Provide electricity supply for industrial and agricultural development:
The main process is:
1. Transportation of palm fruit bunches
2. Shredded palm fruit bunch
3. The crush of palm empty fruit bunch
4. Palm fibre drying
5. Biomass steam boiler combustion
6. Biomass boiler steam power generation systemEFB Biomass Engineering
website:http://www.yahua-group.net/efb-biomass-engineering/
 Printable View

All times are GMT+0 :: The current time is 12:47am
Page generated in 0.46 seconds
Purchase Ad-Free Credits
This Forum is Powered By vForums (v2.4)
Create a Forum for Free | Find Forums